Drill & Blast Tungsten Mine

Controlled Blasting, Presplit Blasting.

Client: Wolfram Camp Mining Pty Ltd
Location: Dimbulah Nth Queensland
Period: October 2011 to September 2013
Value: $8 million

Description of Works:
Drilling and Blasting at the Tungsten mine, including controlled blasting to optimize Ore Recovery, development blasting, & presplit blasting. This site has reactive ground & maze of old underground workings, this site requires continuous monitoring of ground conditions by way of drill logs & existing information, our shotfirers & our Technical department work closely with the mining team to monitor & modify blast design as required to deal with these changing conditions.